The work and base can be heated separately, and the annealing is carried out in a PID-controlled manner thanks to two fans and resistors from the PLC control system.
As for the wake-up process, the working and underfloor heating times can be controlled separately via halogen fittings located at the front of the platforms.
Thanks to the high sensitivity sensor, work safety and quality are increased.
Electrical and mechanical failures are improved by the high control and control system.